Fire stopping after a refurbishment
New kitchens, rewires and boiler swaps all put fresh holes in fire walls. The time to seal them is before the ceilings go back.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Take a block in Hackney where the landlord has just had the common parts rewired, two boilers swapped and a kitchen moved in a ground floor flat. The electrician drilled through each corridor wall for the new cable. The heating engineer cut a hole for each flue and condensate pipe. The kitchen fitter took the new sink waste down through the floor. None of them was asked to seal the walls behind them, so none of them did.

What our contractors do on a refit
On a refurbishment the job is usually a walk round with whoever is running the works to find each new opening, then sealing them floor by floor with the right product for the wall and the service, and photographing each one before it disappears behind a ceiling. The cable in the photo on this page, dropping through a slot cut in the head of a wall, is a typical example of a new route left for someone else to close.
Fire stopping after refurbishment is carried out by our BM TRADA / FIRAS-certificated contractors.
Send a photo with a tape measure across it, the postcode and the type of building. We tell you what it needs and what it is likely to cost.