Fire stopping in Shoreditch

Converted warehouses with offices upstairs and a bar on the ground floor. The floor between them matters most.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

The Hackney side of Shoreditch is full of Victorian warehouses and workshops that now hold offices, studios and flats, often with a bar, restaurant or shop on the ground floor, and newer office buildings have been squeezed in between them. Tenants change often, and every new tenant brings its own cabling, kitchen and air conditioning.

A black cable dropping through a slot cut in the top of a painted wall under a concrete slab
A black cable dropping through a slot cut in the top of a painted wall under a concrete slab

A floor between a bar and an office

Say the ground floor of a four-storey warehouse is a bar with a kitchen at the back, and the floors above are let as offices. The floor over the bar is the most important fire separation in the building. Above the bar's ceiling there might be a kitchen extract duct heading for the roof, condensate pipes from the air conditioning units upstairs, a cluster of data cables run down to a comms cabinet, and the bar's own sound system wiring going up through the floor to speakers somebody fitted upstairs years ago.

Our contractors would work through that ceiling from below with the bar closed, sealing the cables with batt and mastic, collaring the plastic condensate pipes, and checking the gap where the extract enclosure meets the floor. The duct itself would be flagged for a kitchen extract specialist. Every seal goes on the record with a photo before the ceiling is closed.

Office fit-outs

The photo on this page shows a single cable dropped through a slot in the head of a wall, which is very typical of a hurried fit-out, where data cable gets pulled from one room to the next by the shortest route and nobody goes back to seal it. In a multi-let building the landlord usually wants to see a fire stopping record at the end of each fit-out, and if there isn't one, a check of the walls on that floor before the next tenant arrives is a sensible step.

The work in Shoreditch is carried out by our BM TRADA / FIRAS-certificated contractors.

Seen a hole round a pipe that should not be there?

Send a photo with a tape measure across it, the postcode and the type of building. We tell you what it needs and what it is likely to cost.